Four-Laning of NH-254, Bathinda
Upgradation of two-lane with paved shoulder to four-lane configuration near HMEL Township — earthwork, granular layers, dense bituminous macadam and bituminous concrete.
Road, highway and civil works delivered across Punjab for NHAI, MoRTH, PWD B&R, MES and other government departments.
Upgradation of two-lane with paved shoulder to four-lane configuration near HMEL Township — earthwork, granular layers, dense bituminous macadam and bituminous concrete.
Provision of 7 m wide connecting road from HQ Sub Area 81 for Chief Engineer, Military Engineer Services, Bathinda.
Strengthening and rehabilitation of the link road from Bhucho Mandi to Lehra Bega, terminating at the NH-7 junction.
Strengthening of the Kotakpura–Jaitu–Chandbhan plan road for Executive Engineer, PWD B&R, Faridkot — full bituminous rehabilitation including DBM and BC wearing course.
Structural conservation and restoration of the historic Old Thana Monument at Jaito for the Punjab Heritage and Tourism Promotion Board.
The Provision of Stacking Facility Works was conceived and executed as a flagship infrastructure project for the Indian military services, developed for the first time in India with the specific objective of providing a dedicated and secure facility for the storage of ATW Rolls used by the military. The project was designed to meet the operational, logistical, and storage requirements of the armed forces while providing a robust and durable infrastructure capable of supporting long-term military operations.