PWD B&R Road Work FY 2022–23 Completed

Link Road, Bhucho Mandi — Lehra Bega

Client
PWD B&R
Location
Bathinda District, Punjab
Length
7.32 km
Duration
180 days
Completion FY
FY 2022–23

Strengthening and rehabilitation of the link road connecting Bhucho Mandi to Lehra Bega up to its junction with NH-7 in Bathinda District, executed for PWD Buildings & Roads, Punjab. This rural connectivity project significantly improved all-season access for the agricultural communities along the corridor.

Works included milling of the existing distressed bituminous surface, in-situ reclaimed asphalt processing, fresh granular sub-base and wet mix macadam layers, followed by a new dense bituminous macadam course and bituminous concrete wearing surface. Side drains were re-profiled, culvert inlets and outlets were repaired, and retroreflective road markings were applied throughout.

The project was completed within 180 days — well within the contracted schedule — enabling the Punjab PWD B&R to commission the road ahead of the kharif harvest season, directly benefiting local farmers and transporters.

Contact

Have a project in mind?
Let's talk.

Call 87290-22552
Office
100 Feet Road, Near Power House Road Chowk,
Bathinda, Punjab — 151001
Email
jbinfrastructure.2017@gmail.com
Phone
87290-22552
GSTIN
03AANFJ6353N1ZX