MES Building Work 2023-24 Completed

Provn. of Stacking Facility at Bathinda Military Station

Client
MES
Location
Bathinda Military Station, Punjab
Length
-
Duration
18 Months
Completion FY
2023-24

The Provision of Stacking Facility Works was conceived and executed as a flagship infrastructure project for the Indian military services, developed for the first time in India with the specific objective of providing a dedicated and secure facility for the storage of ATW Rolls used by the military. The project was designed to meet the operational, logistical, and storage requirements of the armed forces while providing a robust and durable infrastructure capable of supporting long-term military operations.

Spread over an extensive area of approximately 1,00,000 square feet, the facility represents a significant civil infrastructure development undertaken with stringent quality, durability, and functional requirements. The project involved the construction and development of multiple essential components to create a complete and operational stacking facility.

A major component of the project was the construction of Cement Concrete (CC) Roads, providing strong and durable internal connectivity throughout the facility. These roads were designed to withstand the movement and operational requirements of heavy military vehicles and equipment, while ensuring smooth and reliable access to different storage and operational areas.

The works also included the development of open platforms for systematic storage of ATW Rolls. These platforms were constructed to provide stable, organized, and accessible storage spaces, facilitating efficient handling, inspection, movement, and deployment of the stored material whenever required by the military authorities.

Another important component of the project was the execution of electrical works, including the necessary electrical infrastructure required for safe and efficient operation of the facility. The electrical installations were integrated with the overall facility layout to ensure adequate illumination and operational functionality across the developed area.

The project further involved the construction of culverts and associated civil infrastructure to ensure proper drainage and uninterrupted internal movement. These works were essential for protecting the facility and its road network from water accumulation and ensuring reliable access under varying weather conditions.

Overall, the Provision of Stacking Facility Works stands as a strategically important and technically significant project, combining large-scale civil construction, heavy-duty road infrastructure, electrical works, storage platforms, and drainage structures. The successful execution of this approximately 1 lakh sq. ft. military storage facility reflects the capability to undertake complex, specialized, and mission-critical infrastructure projects in accordance with the demanding requirements of the Indian military services.

Contact

Have a project in mind?
Let's talk.

Call 87290-22552 →
Office
100 Feet Road, Near Power House Road Chowk,
Bathinda, Punjab — 151001
Email
jbinfrastructure.2017@gmail.com
Phone
87290-22552
GSTIN
03AANFJ6353N1ZX